Projects
Smart Sensor Deployment
Green Mechanics installed 10 sensors throughout DC’s stormwater facilities to provide monitoring metrics and cost effective solutions for Department of Energy and Environment (DOEE) stormwater management efforts. This is the first pilot project in the district in efforts to cost effective data driven consultancy for stormwater management sustainability.
Bladensburg Waterfront Park Ecotechnology Demonstration
Green Mechanics is installing two novel ecotechnologies at the historic Bladensburg Waterfront Park to provide environmental educational experiences to the youth; Mitigation of over 1.5 impervious acres in Prince Georges County.
Greenbelt Forest Preserve Deer Exclosure Science Study
Green Mechanics was the first to win Forest Preserve Advisory Board’s (FPAB) Science fund to conduct a 3 year long experimental ecology study. Efforts will help FPAB to develop better deer management protocol for their 1,600+ acre forest preserve. 10 volunteers were engaged in this project.
Grey Water Bioreactor Install
Green Mechanics designed and installed Washington DC’s first set of Greywater bioreactor boxes at University of the District of Colombia’s (UDC) Bertie Backus Urban Farm site.